Dependable & Professional...
A Builder you can trust!

 

 


An Authorized Builder of
Chelsea Modular Homes

Site Prep & Completion
Mountain Modular provides all these services

Engineering:
Towns and/or Financial Institutions will require engineered stamped blueprints for the house, stamped plans for the foundation, board of health approved septic design, and a surveyed plot plan showing locations of the house, well, septic and driveway.

Land Clearing:
Removal of all stumps and trees as required.

Excavation:
To include digging for foundation with necessary drainage, trenches for water and sewer lines and underground utilities (if required), backfill around the foundation and bulldozer on the day of delivery and house set and a crushed stone driveway with culvert pipe from the road to the house.

Foundation:
Eight-inch poured concrete walls with footings or Superior Wall-type foundation system. Homeowner has the choice of either a crawl space or full basement. Frost walls if required. Also included in the foundation work are waterproofing, sill plates and sill seal, attachment hardware, termite protection (if required), 4" reinforced concrete floor, perimeter drainage and R-19 insulation installed in floor joists of house. Any windows, doors, or exterior finishing treatment will be included at homeowner's request and will be quoted as required.

Well:
Actual cost determined by overall depth of well. Included in cost is installation of water pump and run line to foundation.

Septic System:
Calculated and installed per approved-engineered plans.

Plumbing and Heating System:
Connect all fresh water lines to source and all waste lines to sewer outlet. Install hot water tank, boiler, exhaust venting, and connect all hot water lines to baseboard radiators.

Electric:
Run service from pole to house and activate service. Install lights and/or ceiling fans in home and install switches, outlets and lights in basement, as well as electrical hookups needed for the furnace.

Carpentry:
Stairs to the basement with hand rails along with porches and/or decks need to be constructed for final Certificate of Occupancy.

If you think of additional issues you'd like to discuss, please click here and us the handy email form to contact us!

Home

 

© Copyright 2006 - Mountain Modular • All rights reserved • Site Designed by RVM • 06/29/2008